In order to extend the service life of pure water equipment and ensure the quality of effluent, it is necessary to regularly maintain and upkeep it, and replace the reverse osmosis membrane. How to perform daily maintenance and upkeep on pure water equipment specifically? How to replace the reverse osmosis membrane?
How to do daily maintenance and upkeep of pure water equipment?
1. Cleaning
The inside and outside of the machinery and equipment are clean and tidy, with no oil stains on the drag surfaces, ball screws, gears and racks, reducers, oil inlet, etc. There is no oil or steam leakage in any position, and the cutting, dirt, and dirt around the machinery and equipment should be cleaned up neatly.
2. Neat and neat
Special tools, notes, and steel parts (products) should be placed neatly, and pipelines and routes should be organized and clear.
3. Moisturizing
Timely oil or oil change, continuous oil, no dry friction, normal vapor pressure, bright oil level gauge, unobstructed fuel pipe, oil meets regulations, oil gun, oil gauge, and polypropylene cloth are cleaned.
4. Security
Follow the operating procedures, do not overload the application of machinery and equipment, ensure that the safety devices of the machinery and equipment are complete and reliable, and immediately remove any unsafe elements.
How to replace the reverse osmosis membrane of pure water equipment?
1. Close the electroplating process gate valve and wait for 10 minutes to move up and down.
2. Use a special tool to unscrew the screw cap connector on the right side of the membrane housing, and then pull out the water pipe.
3. Respond to the machine equipment in a clockwise manner, holding the membrane shell with the first hand and twisting the outer cover of the tail with the other hand.
4. Close the pressure tank gate valve, use a special tool to unscrew the screw cap connector, and guide the water pipe into the stainless steel washing sink.
5. Hold the reverse osmosis membrane tube with one end and use pointed pliers to pinch the old RO membrane, pulling it out vigorously.
6. Open a new RO membrane cover and remove it.
7. Insert the RO membrane into the RO membrane tube until one side of the two gray black small "O" rings reaches the bottom of the membrane shell.
8. Tighten the membrane housing cover.
9. Insert the water pipe and tighten the connecting screw cap.
10. Open the electroplating process gate valve.
11. Allow the machine equipment to work for at least 2 hours, then connect the water pipe to the pressure tank gate valve, and finally open the pressure tank gate valve.
专业水处理的疑难问题,产品选型问题,可以单击下面的微信二维码电话联系贺工在线指导,长按微信二维码可自动识别添加贺工微信沟通解决您的疑难问题


简体中文
Vietnamese
Persian
繁体中文
Albanian
Irish
Arabic